Impressions of Doha North STP TSE Lagoon in the autumn

Now is the perfect time to sit in the Gazebos, relax an ejoy the flowering reeds rustling in the wind.

Doha North STP Lagoon, Gazebo
Doha North STP Lagoon, Gazebo

 

Doha North STP, TSE Lagoon Walkway
Doha North STP, TSE Lagoon Walkway

The fish stock developed during the summer and when feeded swarms of fish coming to the shore

Doha North STP TSE Lagoon Fish
Doha North STP TSE Lagoon, Fish – Killyfish
Doha North STP TSE Lagoon, Fish
Doha North STP TSE Lagoon, Fish – Tilapia

 

Doha North STP Lagoon, Gazebo
Doha North STP Lagoon, Gazebo

 

 

Reed Bed for Kalba Wildlife Center

A reed bed is under construction for the Kalba Wildlife Center.

Designed in cooperation with Blumberg- engineers as spezialized sub-consultant  for Mott Mac Donald.

Reed Bed is designed as single stage vertical flow reed bed split into 2 basins with a 3 chamber septic tank as pre-treatment.

Kalba Reed Bed Excavation
Kalba Reed Bed Excavation

 

Compacted reed bed basins
Compacted reed bed basins

 

Installation of liner
Installation of liner

 

Reinforcement work of septic tank
Reinforcement work of septic tank